Synergy3

URBAN+ Multi-disciplinary, international design- and innovation competition.

The integrated design approach has been carried out in three steps. First, focused on reducing the need for energy and resources. Second, focused on maximizing possibilities of producing energy by the building using assets of its localization and architectural elements. In the third step both the previous steps were confronted allowing finding self-sufficient building that size and form are chosen in order to balance energy demand with simulated energy production. The form-finding process and assumed energy demand and production resulted in self-sufficient building producing over 2kWh/m2/year. 

Authors: Krystian Kwieciński, Jacek Markusiewicz, Agata Pasternak
Visualization: Karol Terlikowski
Engineering Consulting - BuroHappold Engineering:

  • Sustainability Engineer: Manuel Delgado
  • Energy Engineer: Ander Gortazar Balerdi
  • Energy and HVAC Engineer: Julia Kamińska
  • Structural Engineers: Konrad Leski, Paweł Młynarczyk

Size: 18 350 m²
Location: Lilletorget 1, Oslo, Norway

Competition website: arkitektur.no/urban

2015.